About 9,300 kg of hydrocarbon-and-nitrogen cooling medium leaked over roughly six and a half hours while insulation was being removed near a safety valve. The plant was evacuated and production stopped for eight days. One worker was sprayed and received medical follow-up but suffered no identified permanent harm. Havtil found that nearby gas detectors did not automatically alarm.

When cited sources give different casualty, damage or spill figures for this event, they’re reported side by side above rather than merged into one number. See how confidence levels work.

Evidence
Documented
Confidence
High
Infrastructure
LNG Facility
Current temperature
Loading…
Latitude
70.6900°
Longitude
23.6700°

Attribution

Responsibility has not been established in the cited reporting.

Sources

  1. Equinor — Hammerfest LNG — investigation of gas leakNorwegian Ocean Industry Authority (Havtil) · Incident reporting