NLC Neyveli TPS-II Unit 5 — fatal explosion and fire
1 July 2020 · approximately 09:45 local time
Neyveli, Cuddalore district, Tamil Nadu, India
Map
11.5576, 79.4416
What happened
An explosion followed by fire struck the 210 MW Unit 5 boiler-support structure at NLC India's Thermal Power Station II while the unit was shut for maintenance. Unit 5 had been taken offline at 09:30 the previous day and left to cool. Workers began water-cleaning boiler floors and structures at about 07:00; the explosion occurred at approximately 09:45 while personnel were cleaning accumulated lignite dust in a box-type girder. Six workers died at the scene and 17 were hospitalized. Nine of those hospitalized later died, bringing the final toll in the independent investigation to 15, rather than the preliminary totals of 6, 12, 13 or 14 reported as the death toll rose. Investigators concluded that the explosion occurred outside the boiler furnace in its supporting structure. Their analysis identified inadequate awareness of combustible water-gas generation, accumulated lignite dust, deficient housekeeping and insufficient emergency planning as key safety issues. NLC suspended the TPS-II unit head, opened internal and independent inquiries and ordered all four 210 MW Stage-II units shut for immediate safety audits. The accident came only 55 days after the fatal Unit 6 fire at the same station.
When cited sources give different casualty, damage or spill figures for this event, they’re reported side by side above rather than merged into one number. See how confidence levels work.
- Evidence
- Documented
- Confidence
- High
- Infrastructure
- Power Station
- Current temperature
- Loading…
- Latitude
- 11.5576°
- Longitude
- 79.4416°
Attribution
Responsibility has not been established in the cited reporting.
Sources
- Independent committee report on the 1 July 2020 Neyveli accidentCentral Pollution Control Board · Incident reporting
- Fire Accident in Unit V of Thermal Power Station-II on 01-07-2020NLC India Limited · Operator confirmation of timing, shutdown status, six immediate deaths, 17 initial hospitalizations and the four-unit safety shutdown
- High level inquiry into boiler explosion accident orderedPress Information Bureau, Government of India · Official confirmation of the high-level inquiry, management actions and wider Stage-II shutdown
- India NLC power plant hit by second fatal explosion in two monthsAl Jazeera and news agencies · Independent contemporaneous reporting linking the Unit 5 explosion to the May Unit 6 disaster
- Neyveli Thermal Power Station IIGlobal Energy Monitor · Facility, unit-capacity and exact-coordinate reference