Fire

Power Grid

IFA1 Sellindge converter station — fire cuts UK–France interconnector

15 September 2021

Sellindge, Kent, United Kingdom

51.1100, 1.0000

Loading free detailed map…

What happened

A major fire at the Sellindge converter station in Kent forced the IFA1 electricity interconnector between Britain and France completely offline. One 1,000 MW bipole returned in late October 2021, while extensive replacement work was required on the damaged bipole and constrained cross-Channel capacity into 2022. No evidence reviewed indicates deliberate sabotage, so this is recorded as an accidental infrastructure fire rather than an attack.

When cited sources give different casualty, damage or spill figures for this event, they’re reported side by side above rather than merged into one number. See how confidence levels work.

Evidence
Documented
Confidence
High
Infrastructure
Power Grid
Current temperature
Loading…
Latitude
51.1100°
Longitude
1.0000°

Attribution

Responsibility has not been established in the cited reporting.

Sources

  1. National Grid half-year results — IFA converter-station fireNational Grid · Incident reporting
  2. IFA1 fire asset-replacement procurement noticeUK Find a Tender Service · Zero-capacity impact and late-October partial restoration chronology