EnergyWar.net

Sabotage

Power Grid

Bamako–Manantali line — suspected sabotage and power/water outages

5–7 July 2026 · outage period reported; repair follow-up 9 July

Bamako, Mali (affected-city reference)

12.6400, -8.0000

Preparing your incident map…Loading the basemap and incident layers

What happened

Africanews/AFP reports several districts lost power and water after a transmission-line incident. EDM confirmed the network disruption without identifying its cause; a SOMAGEP official attributed it to sabotage of the Manantali–Bamako line, with perpetrators unidentified. This July event is separate from the May sabotage already recorded. A 9 July follow-up reports water supply returned; that does not establish full restoration of all electricity services. The date range describes reported outages, not a verified attack time. The marker identifies affected Bamako, not the damaged line section.

When cited sources give different casualty, damage or spill figures for this event, they’re reported side by side above rather than merged into one number. See how confidence levels work.

Evidence
Reported / attributed
Confidence
Moderate
Infrastructure
Power Grid
Weather context
Loading…
Latitude
12.6400°
Longitude
-8.0000°

Attribution

Responsibility has not been established in the cited reporting.

Sources

  1. Africanews/AFP — suspected July power-line sabotage and Bamako outagesAfricanews with AFP · Incident reporting
  2. Africanews — water returns to Bamako, 9 JulyAfricanews · Additional reporting