Operational failure

Nuclear Power Plant

Pilgrim — permanent reactor closure

31 May 2019

Massachusetts, United States

41.9400, -70.5800

Loading free detailed map…
No radiological release

What happened

Unit 1 permanently ceased commercial operation. This is a reactor closure, not a nuclear accident or an unplanned outage.

When cited sources give different casualty, damage or spill figures for this event, they’re reported side by side above rather than merged into one number. See how confidence levels work.

Evidence
Documented
Confidence
High
Infrastructure
Nuclear Power Plant
Current temperature
Loading…
Latitude
41.9400°
Longitude
-70.5800°

Attribution

Responsibility has not been established in the cited reporting.

Sources

  1. PRIS permanent-shutdown reactor databaseInternational Atomic Energy Agency · Incident reporting